BLNKKSOLUTION NAVIGATOR
Menu

Semiconductor and package reliability qualification programs

Integra Technologies, a Micross company · Reliability qualification and failure analysis

Purpose
New devices, packages or material changes need a reliability qualification plan tied to their operating environment, linking stress conditions, sample flow and failure analysis rather than relying solely on a generic checklist.
Technical approach
Integra offers guidance to define the plan and manage tests and data. A project can select thermal cycling, thermal shock, humidity or life testing and combine these with construction/failure analysis.
Scope of use
Published services cover device/package qualification, plastic encapsulated microcircuits (PEMs) and copper-wire evaluation for aerospace, defense, automotive and other applications. The test combination and standards require project-specific agreement.
Limitations and open questions

These evaluation considerations are compiled by BLNKK from public information. They are not supplier guarantees or a mandatory submission checklist.

Scope and limitations

Test execution does not guarantee qualification success or expected service life. FAQ sample counts and stress sequences are examples, and copper-wire capability does not establish qualification of every wire material.

What to prepare

BLNKK suggests preparing device/package and material changes, operating conditions, target requirements, previous tests and failures; wire-bond investigations also need wire materials, bonding metals and suspected locations.

Confirm with the supplier

Confirm the qualification plan, standard editions, representative sample quantities, stress/rejection criteria and handling/reporting of failures. Wire-bond work also needs agreement on decapsulation and pull/shear methods.

Public evidence
The service page describes planning and project management; the October 2024 PEM FAQ gives package risks and an example flow. The copper-wire page separately lists pull/shear, cross-section and SEM/EDX capabilities.

Supporting references

Contact the supplier

Find the company’s contact details and ask about this solution through its official channels.

Related engineering problems

These links use established solution relationships. Continue to engineering conditions and evaluation preparation.

BLNKK organizes information from public sources. A company profile does not imply a documented solution. Applicability still needs confirmation against your samples and engineering conditions.