Simcenter Micred Power Tester for power cycling and failure-in-progress monitoring
Siemens Digital Industries Software · Reliability qualification and failure analysis
- Purpose
- Repeated heating and cooling can degrade a power device’s thermal path or electrical behavior. Power Tester tracks these changes during cycling to support package and assembly comparisons.
- Technical approach
- It combines active power cycling, electrical monitoring and thermal transient measurements without removing the DUT. Structure functions derived from thermal responses reveal changes in thermal resistance and heat paths.
- Scope of use
- Readable official sources cover IGBT, MOSFET and SiC reliability studies. Device compatibility and drive/measurement configurations need supplier confirmation.
- Limitations and open questions
These evaluation considerations are compiled by BLNKK from public information. They are not supplier guarantees or a mandatory submission checklist.
Scope and limitationsAccelerated cycle counts do not directly establish field lifetime. Siemens notes that cycling strategy affects failure modes and estimates; signals may not establish every root cause.
What to prepareBLNKK suggests preparing connections, current/power ranges, cooling boundaries, operating cycles and failure criteria. Bring mission-profile data for any field-lifetime discussion.
Confirm with the supplierConfirm model, device compatibility, temperature calibration, cycling control, thermal sampling intervals and analysis options. Agree on failure criteria, data delivery and supplementary analysis.
- Public evidence
- The 2018 white paper presents POWERTESTER 1500A experiments, supplemented by a ZFW case and SiC webinar outline. These are not lifetime guarantees for every device.
Supporting references
Contact the supplier
Find the company’s contact details and ask about this solution through its official channels.
Related engineering problems
These links use established solution relationships. Continue to engineering conditions and evaluation preparation.
BLNKK organizes information from public sources. A company profile does not imply a documented solution. Applicability still needs confirmation against your samples and engineering conditions.
